Riverbank revetment, Lemwerder; River Weser, kilometres 11,700 to 17,012 (Germany)
Bremen Water and Shipping Authority renewed is currently renewing the riverbank revetment between Lemwerder and the Hasenbüren marina. The fifty-year-old asphalted revetment is being replaced by loose riprap; the aim of the construction project is to preserve the river as a waterway for traffic on the river, and also to secure the dyke protecting the land. In detail... Revetment installation on a 4 km river section Reinforcement of the dyke embankment for 2.5 km Site area: 54,600 m²
Fakta:
| Kunde: | Thieling-Bau-GmbH, Stadland |
|---|
| Byggetid: | 2004 until probably 2017 |
|---|
| Byggekostnader: | Around €15 million |
|---|
| Underleverandør: | Heuvelman Ibis GmbH, Leer & Mibau Baustoffhandel GmbH, Cadenberge |
|---|
| Leveringsmengde: | Around 95,000 tonnes of riprap and 80,000 tonnes of grain filter |
|---|
| Source: | Jelsa and Kragerö |
|---|
| Logistics | Chartered dredgers |
|---|
| Terminals | Louis-Krages-Straße via Bremen industrial harbour |
|---|
| Tiltenkt bruk: | Bank reinforcement on the Weser |
|---|