Mibau Stema Group

Infrastruktur

tilbake

PKP railway No. 226 from Pruszcz Gdański to Gdańsk Port Północny

Construction and expansion of the railway connection between Pruszcz Gdański and the Gdańsk port In detail... 28 km new railway line

Fakta:

Kunde:Vias Esp., Dragados, Polaqua
Byggetid:2015 – 2016
Byggekostnader:zł 151 million
Underleverandør:Strabag, Polski Asfalt, Kirchner
Leveringsmengde:Quarter of a million tonnes
Tiltenkt bruk:Gravel blend and washed railway ballast