Infrastruktur
tilbakePKP railway No. 226 from Pruszcz Gdański to Gdańsk Port Północny
Construction and expansion of the railway connection between Pruszcz Gdański and the Gdańsk port In detail... 28 km new railway line

Fakta:
| Kunde: | Vias Esp., Dragados, Polaqua |
|---|---|
| Byggetid: | 2015 – 2016 |
| Byggekostnader: | zł 151 million |
| Underleverandør: | Strabag, Polski Asfalt, Kirchner |
| Leveringsmengde: | Quarter of a million tonnes |
|---|---|
| Tiltenkt bruk: | Gravel blend and washed railway ballast |



