Groyne construction in Otterndorf, Germany
One of the largest coastal protection projects in Germany, this project involved constructing twenty-four groynes on the banks of the Elbe between Otterndorf and Altenbruch to reduce bankside flow speeds. In detail... 3.5 km of coastline 4.9 km of groynes Longest groyne: 330 meters Installation only at low tide via quai 9 of Mibau Baustoffhandel materials merchants in Cuxhaven
Fakta:
| Kunde: | ARGE Buhnenbau Otterndorf (Hinrich Hirdes, Colcrete von Essen, Bunte, Van den Herik) |
|---|
| Byggetid: | 2011 – 2012 |
|---|
| Byggekostnader: | €33 million |
|---|
| Underleverandør: | Mibau Baustoffhandel GmbH |
|---|
| Leveringsmengde: | 530,000 tonnes of riprap |
|---|
| Tiltenkt bruk: | Coastal protection |
|---|