Infrastruktur
tilbakeS7 motorway from Gdansk-Warszawa to Kalsk-Miłomłyn (Poland)
New four-lane asphalted motorway In detail... 36.5 km four-lane motorway

Fakta:
| Kunde: | STRABAG SE |
|---|---|
| Byggetid: | 2010 – 2012 |
| Byggekostnader: | zł 1.1 billion |
| Underleverandør: | Strabag, Polski Asfalt, Kirchner |
| Leveringsmengde: | 1.4 million tonnes |
|---|---|
| Tiltenkt bruk: | Road substructure and asphalt chippings |



