Riverbank revetment, Lemwerder; River Weser, kilometres 11,700 to 17,012 (Germany)

Bremen Water and Shipping Authority renewed is currently renewing the riverbank revetment between Lemwerder and the Hasenbüren marina. The fifty-year-old asphalted revetment is being replaced by loose riprap; the aim of the construction project is to preserve the river as a waterway for traffic on the river, and also to secure the dyke protecting the land. In detail... Revetment installation on a 4 km river section Reinforcement of the dyke embankment for 2.5 km Site area: 54,600 m²

Fakta:

Kunde:Thieling-Bau-GmbH, Stadland
Byggetid:2004 until probably 2017
Byggekostnader:Around €15 million
Underleverandør:Heuvelman Ibis GmbH, Leer & Mibau Baustoffhandel GmbH, Cadenberge
Leveringsmengde:Around 95,000 tonnes of riprap and 80,000 tonnes of grain filter
Source:Jelsa and Kragerö
LogisticsChartered dredgers
TerminalsLouis-Krages-Straße via Bremen industrial harbour
Tiltenkt bruk:Bank reinforcement on the Weser